Bio Business Center

Completed in 2009, the Bio Business Center in Rochester, Minnesota utilizes our building automation system for the core building, where we control the air handlers, boilers, and chillers to provide the comfort ventilation for all 8 floors of the building. We control an energy recovery unit and cooling tower along with the building pressurization control […]

Read more

Austin Public Utilities

The new building was completed in 2016. We installed the American Auto-Matrix Building Automation system to control the complex heating and cooling system. They used a combination of Heat Pump, Boilers, and Geo Loops to provide hot water and chilled water to the building. The building uses air handlers and VAV’s to provide comfort in […]

Read more

Spring Grove School

The school district updated the  old pneumatic controls to a new state of the art building automation system. We installed American Auto-matrix controllers with the Nexus front end platform which gave the school HTML access to the system using a variety of interfaces including smart phones, tablets, and computers. Some of the features the new […]

Read more

Trempealeau County Health Care Facility

The new 123,000 square-foot building is located in Whitehall, WI.  The new facility will continue its licensing as a 112 bed institution for mental disease and a 34 bed nursing home.  We installed the Mechanical Heating & Cooling systems, which included 6 ERV’s, 1-200 ton Chiller, 1-30 ton Dry Cooler, 2-3000 MBH Hot Water Boilers, […]

Read more

Organic Valley Conversion and Labeling Facility

The new 22,300 square-foot building is located on the Cashton site.  This new facility allows the company to produce more of its’ Ghee butter, as well as handle cheese cutting for blocks, sticks, and shreds.  We installed the Mechanical Heating & Cooling, Plumbing, and Building Automation systems, which included 2 large custom built food grade […]

Read more

Pablo Center at the Confluence

The new $45 million state-of-the-art Pablo Center at the Confluence will provide much-needed rehearsal, teaching and support space for the university’s theater program and a significantly larger performance venue for its nationally renowned music program.  We installed the Mechanical Heating & Cooling, Plumbing, and Building Automation systems which included 8 Roof Top Units, 3 Hot […]

Read more

River Ridge School District

The River Ridge School District was just completed in November of 2017, the project consisted of a new gymnasium addition and complete HVAC remodeling of existing high school and elementary school. The project consisted of installing new five new air handling units, two new roof top units, 13 new unit ventilators and 2 new high […]

Read more

Prairie Du Chien School District

We are currently working on three schools for the School District of Prairie Du Chien. The schools include Bluffview Intermediate School, BA Kennedy Elementary and the High School. The work consisted of installation of DX cooling in BA Kennedy Elementary school which happened last summer. We installed 3 new air handlers with DX cooling and […]

Read more

Rushford High School

The Rushford High School project was the construction on a new 33 million dollar, 150,000 square foot facility. Winona Controls was contracted to do the plumbing and HVAC for the project. The project was extremely large with a very tight construction schedule. Winona Controls completed the project on schedule as we have done on all […]

Read more

High Pressure Piping: Weyerhauser, Austin, MN

As a sub-contractor Winona Controls installed all high pressure piping for the installation of two 200 horse power, 250 psi design steam generators and a new DA system. The plant was back up and running after only one week of down time.

Read more

Emergency! Boiler down! Plant down!

Don’t panic, call 1-800-808-7360 Winona Controls can hookup a portable rental unit and get you back on line and running!