Plumbing: Cora B. Darling Schools, Postville, IA
Extensive remodeling of the plumbing to modernize fixtures with electronic flush valves and to meet handicap accessibility. In addition Winona Controls sub-contracted the interior Geo-Thermal piping. This consisted of over 12,000 feet of pipe. The entire project was complete during summer school break.
Read moreBoilers: Sno-Pac Foods Inc. Caledonia, MN
Winona Controls designed and installed a high pressure steam system for Sno-Pac Foods new processing plant. The system included organic approved steam filtration system and pneumatic control of the blancher. In addition Winona Controls installed all the ventilation, heating, and air conditioning for the facility.
Read moreHigh Pressure Piping: Weyerhauser, Austin, MN
As a sub-contractor Winona Controls installed all high pressure piping for the installation of two 200 horse power, 250 psi design steam generators and a new DA system. The plant was back up and running after only one week of down time.
Read moreEmergency! Boiler down! Plant down!
Don’t panic, call 1-800-808-7360
Winona Controls can hookup a portable rental unit and get you back on line and running!