Plumbing: Cora B. Darling Schools, Postville, IA
Extensive remodeling of the plumbing to modernize fixtures with electronic flush valves and to meet handicap accessibility. In addition Winona Controls sub-contracted the interior Geo-Thermal piping. This consisted of over 12,000 feet of pipe. The entire project was complete during summer school break.
Read more